← Mueller Labs

Grounds

417 Greenvale · lawn · Aug 22 – Sep 22

Garden next.

This weekend

Water the night before. Pull purslane by the taproot once it’s soft. Bag it if it’s seeding. Kids areas: hands only, no spray.

Seed zones

Greenvale · ~50′ front
Front driveSun · water · purslane
Shaded sideDid well · keep clover
House + patio · water ends at garden pad
Near patioGreener · water
East play patch~10′ N of fence · water
Back half to fence · dryNo cool-season seed · oak lives here
Water · sun → fescue-heavy Water · shade → leave Dryland → don’t seed

Buy seed

1st: TinaWestHydro · 970-223-3784
same May mix
2nd: Bath2000 E Prospect
Buffalo Dura-Turf
Add cloverDutch white
~5% by weight
Sunny spotsFescue-heavy
over bluegrass

Nursery yard sale starts Mon Aug 24 if you want a third stop. Skip seeding past the irrigation line.

Overseed thin spots

  1. Clear purslane / knotweed from bare dirt.
  2. Scratch the top ¼″. Drop seed so it kisses soil.
  3. Light compost or peat dusting on clay helps.
  4. Keep damp 10–14 days (short morning + evening on new seed only).
  5. Then back to city watch: ≤2 days/week, no watering 10am–6pm.

Priority patches

Rules while it grows

Don’t use broadleaf weed killer now — it kills clover and can burn young hydroseed. No pre-emergent until spring 2027 after fall seed is established.

Trees

417 Greenvale · approx lot · existing + planned trees GREENVALE · N · ~50′ 413 W 421 E open space S / SW tip NE med NW sm HOUSE ~43×45′ patio / deck large deciduous E play thin · wet play fence E canopy Accolade elm planned · irrigated shed Vego + bath gravel pad irrigation cutoff spruce W fence Bur oak planned · dryland S fence · young row ← W (oak)········E (play) → approx
Existing canopy Planned Accolade (wet) Planned bur oak (dry) Irrigation cutoff Irrigated Dryland

Pickup: Sat Sep 12 · 8am–2pm · Hoffman Mill · both from Rooted in Community ($25 each).

Plant day

Pickup: Sat Sep 12 · 8am–2pm · Hoffman Mill, 1380 Hoffman Mill Rd. Accolade elm + bur oak · ~1–1½″ caliper · ~5–8 ft · container or small root ball (not 2″ nursery B&B).

Jobsite kit
shovel
tarp
mulch
hose / soaker or 5-gal
stakes + ties optional

Placement: Bur oak = west by spruce dry edge. Accolade = irrigated mid west-central, ≥25–30′ from oak, clear of shed / play / Vego.

1

Haul

pickup to yard
Haul truck bed tarp shade lift by pot never by trunk same day or shade 1–2 days

Tarp the bed · keep root ball cool · plant today if you can.

2

Dig

wide · not deep
Dig cross-section grade flare at grade hole 2–3× ball width ball not deeper than flare

Find the flare first · peel off excess soil on top of the ball.

3

Roots

free circling
Roots container tease / score slide pot off B&B cut top ⅓–½ wire / burlap

Circling roots girdle later · open them before backfill.

4

Set

flare + backfill
Set grade flare at / above grade native soil no fert in hole water to settle

Don’t bury the flare · backfill native · soak to collapse air pockets.

5

Mulch

ring · no volcano
Mulch ring ✓ ring 2–3″ · 3–6″ clear ✗ volcano mulch up trunk

Keep mulch off the trunk — volcanoes invite rot and rodents.

6

Water

deep soak
Water deep hose / soaker slow deep · not sprinkles weekly · 2 seasons oak: hose longer

Front Range: slow deep soaks. Oak on dry edge needs hose / temp drip longer.

Stake

optional
Optional stake loose ties stake stake remove ~1 year

Only if wind / wobbly. Loose figure-8 ties — don’t girdle.

Month timeline

Now–Aug 31Pull · buy seed · sow
Sep 1–14Keep seed damp · mow high
Sep 15–22Last good overseed window
Early OctFrost risk · stop seeding